20+
Years Experience
12K+
Projects Delivered
8–12%
Target Gross Yield
★ 5
Work Ethic
Class 1b compliance engineered in — not retrofitted
Fire separation, acoustic walls, exit lighting, and ensuite compliance designed from the first sketch, not discovered during the building surveyor inspection
Fixed-price contracts on every standard build
Agreed scope, agreed price, agreed timeline, no open-ended provisional sums, no post-contract surprises on standard works
Turnkey delivery, ready to rent from day one
Occupation permit, CAV licence, council registration, safety certificates, all coordinated so your first tenant can move in without a gap
One site contact for the full construction program
You deal with one experienced construction coordinator throughout your build, not a different project manager at every phase
- Fire separation between rooms
- Exit signs & emergency lighting
- Acoustic separation between rooms
- Sprinkler system requirement
- Council prescribed accommodation registration
- CAV operator licence
Class 1b
- Fire separation between roomsRequired — engineered in
- Exit signs & emergency lightingRequired — installed as standard
- Acoustic separation between roomsDouble-plasterboard + insulation
- Sprinkler system requirementDesigned and coordinated
- Council prescribed accommodation registrationCoordinated post-build
- CAV operator licenceSupported at handover
Class 1a
- Fire separation between roomsNot required
- Exit signs & emergency lightingNot required
- Acoustic separation between roomsBasic provisions only
- Sprinkler system requirementNot required
- Council prescribed accommodation registrationNot required
- CAV operator licenceNot applicable
Full-Service Rooming House Construction Management
End-to-end construction management for new rooming house builds in Melbourne — from pre-construction planning, subcontractor engagement, material procurement, and site establishment through to practical completion, occupation permit, and handover. Your dedicated construction manager oversees every trade, every inspection, and every milestone with a single point of accountability throughout.
- Single point of contact
- All trades managed
- Class 1b compliant
Fixed-Price Rooming House Builds
Our standard rooming house builds are priced on a fixed-price contract — agreed scope, agreed price, agreed timeline. No provisional sums, no open-ended cost items, no post-contract price surprises on the agreed works. Fixed-price contracts protect investors from cost overruns and are the format we recommend for all standard new-build rooming houses. We provide detailed specification documentation and a fixed-price tender before any contract is signed. In Melbourne's current market, a standard 5-room rooming house typically costs $680,000–$1.05M in construction cost.
- No cost surprises
- Full specification
- Agreed timeline
Fast-Track Construction (Time-Critical Builds)
When your investment timeline is time-sensitive — a settlement date, a finance facility expiry, or an NDIS funding window — our fast-track construction program accelerates the build phase through pre-ordered materials, prefabricated structural elements, overlap scheduling of trades, and intensive site supervision. Fast-track programs typically reduce the construction phase by 10–25% against standard program durations without compromising Class 1b compliance or defect standards.
- 10–25% time saving
- Prefab elements available
- Intensive scheduling
Rooming House Renovations & Upgrades
Renovation and upgrade services for existing registered or unregistered rooming houses in Melbourne — room reconfiguration, new ensuite and kitchenette installations, fire safety upgrades, acoustic wall lining improvements, new floor finishes, painting, kitchen and bathroom refurbishment, and external works. Renovation scope is assessed during a pre-works site inspection and quoted on a fixed-price basis wherever the scope is clearly defined. A planning permit amendment may be required for significant structural changes or additions.
- Existing buildings
- Fixed-price scope
- Permit managed if needed
Fire Safety System Installation (Rooming Houses)
Specialist installation of all fire safety systems required for Class 1b rooming house compliance in Melbourne — hardwired interconnected smoke alarm systems, fire-rated wall and ceiling lining between rooms and common areas, exit signs (illuminated, internally lit), emergency lighting in corridors and hallways, fire-rated door hardware and self-closing mechanisms, fire extinguishers, fire blankets, and sprinkler systems where required by the building surveyor. Fire safety systems are installed as part of every new build and as a standalone service for existing buildings requiring compliance upgrades.
- Hardwired smoke alarms
- Exit signs & emergency lighting
- Fire-rated construction
Commercial-Grade Fit-Out for Shared Living
Rooming houses operate under a semi-commercial use classification and their fit-out should reflect that. Standard residential-grade finishes, fixtures, and fittings are not appropriate for multi-tenant properties with high daily use. Rooming House Victoria specifies and installs commercial-grade fittings — stainless steel or solid surface kitchen benches, heavy-duty vinyl plank flooring, commercial-grade laundry equipment, heavy-duty door hardware, and durable communal kitchen and laundry fit-outs — that reduce ongoing maintenance costs and extend the life of your investment asset.
- Commercial-grade fixtures
- High-use durability
- Lower maintenance costs
Room-by-Room Fit-Out (Ensuite Installations)
Private ensuites are the single most important value-adding feature in a Melbourne rooming house — commanding an $80–$100 per week per room premium over shared-facility rooms in the current rental market. Rooming House Victoria installs purpose-designed, compact private ensuites in every room as part of our new builds, and as a standalone service for existing rooming houses. Ensuite installation requires plumbing modifications, waterproofing, tiling, vanity, shower, and exhaust ventilation — all coordinated and completed by our licensed plumbing and tiling teams.
- $80–$100/wk premium per room
- Licensed plumbing team
- Existing buildings too
Electrical & Plumbing for Multi-Tenant Properties
Multi-tenant rooming houses require electrical and plumbing installations fundamentally different to standard residential properties — individual circuit metering or sub-metering for each room, high-capacity hot water systems for multiple simultaneous users, separate laundry plumbing runs, and electrical load calculations based on multi-tenant occupancy patterns. All electrical work is performed by licensed A-grade electricians and all plumbing by licensed plumbers under our direct construction management supervision, with certificates of compliance issued at completion.
- Individual room metering
- Multi-user hot water design
- Certificates of compliance
Compliance Upgrades for Existing Rooming Houses
If your existing Melbourne rooming house has been issued a council notice, failed an Environmental Health inspection, or is operating without full Class 1b compliance, our compliance upgrade service addresses the specific deficiencies identified — fire safety system upgrades, acoustic separation lining, ensuite and bathroom standards compliance, window latch and security upgrades, ventilation improvements, and exit path remediation. We conduct a compliance gap assessment before quoting — so you know exactly what is required and what it will cost before any work begins.
- Gap assessment first
- CAV standards compliance
- Council notice resolution
Project Management for Multi-Unit Builds
Multi-unit rooming house developments — two or more buildings on a single site — require construction project management that coordinates concurrent programs, shared infrastructure delivery, and staggered occupation permit applications. Our multi-unit build coordination service manages the construction of multiple rooming house buildings simultaneously, minimising total program duration, reducing holding costs, and ensuring that shared infrastructure (shared driveways, stormwater connections, Owners Corporation common property) is delivered correctly for all buildings.
- Concurrent program management
- Shared infrastructure
- Staggered OC applications
Turnkey Rooming House Delivery (Ready to Rent)
Our most comprehensive construction package — a fully completed, legally compliant, tenant-ready rooming house delivered to you on handover day. Occupation permit issued. Council prescribed accommodation registration coordinated. CAV Rooming House Operator's Licence application supported. Gas and electrical safety certificates issued. All defects resolved. Property manager introduced. Optional furnishing coordination available. You receive the keys and your first tenant can move in the next day. There is no gap between practical completion and rental income.
- Occupation permit included
- CAV licence supported
- Income from day one
Defect Rectification & Building Repairs
If your rooming house was built by another company and has defects — structural, waterproofing, fire safety, acoustic, or finishing defects — our rectification service assesses, quotes, and resolves the specific issues identified. We also provide building repair services for rooming houses damaged by water ingress, structural movement, subfloor issues, fire damage, or general deterioration. All rectification and repair works are scoped and quoted on a fixed-price basis after a site inspection. We provide an independent defect assessment report on request.
- Independent assessment
- Fixed-price rectification
- All defect types
Rooming House Project Coordination
For land owners or investors who already have their own builder but need specialized compliance and project management oversight. We act as your independent project coordinator, managing the complex interface between your builder, the building surveyor, the fire engineer, and local council. We conduct independent quality milestones, track the program schedule, ensure strict Class 1b compliance is maintained during the build, and coordinate the final rooming house registration and occupation approvals.
- Independent oversight
- Class 1b compliance tracking
- Surveyor & council coordination
7+
Fire safety system types required in a standard Class 1b rooming house
7+
Fire safety system types required in a standard Class 1b rooming house
FRL
Fire Resistance Level specified for every wall, floor and ceiling between occupancies
25m
Sprinkler trigger threshold larger Class 1b buildings above floor height threshold
Hardwired Interconnected Smoke Alarms
Hardwired (not battery-only) smoke alarms required in every bedroom, every common area, and every corridor. Interconnected so when one triggers, all sound simultaneously throughout the building.
- Every room & corridor — NCC requirement
Fire-Rated Wall, Floor & Ceiling Construction
Walls and ceilings separating each occupancy from the common areas must achieve specified Fire Resistance Levels (FRLs) typically requiring fire-rated plasterboard, fire-rated penetration seals, and compliant fire-rated construction methods at all service penetrations.
- FRL specified by building surveyor per building configuration
Exit Signs (Illuminated)
Internally illuminated exit signs required above all exit doors and at all changes of direction on exit paths, visible from all positions in the corridor or common area. Must remain illuminated during power failure (battery backup required).
- All exits & escape route changes of direction
Emergency Lighting in Common Areas
Emergency lighting required in all corridors, hallways, and exit paths, providing sufficient illumination for occupants to safely navigate to the exit during a power failure. Battery backup duration requirements apply.
- All corridors, hallways & exit paths
Fire Extinguishers & Fire Blankets
A compliant fire extinguisher must be located in the communal kitchen area and within required travel distance of all rooms. Fire blankets are required adjacent to cooking areas. Annual service and certification is required post-completion.
- Kitchen area & within travel distance of rooms
Sprinkler Systems (Where Triggered)
Automatic fire sprinkler systems are required in Class 1b buildings that exceed certain floor height or area thresholds under the NCC. The building surveyor's specification determines the requirement. Where required, sprinkler systems must be designed by a fire engineer and installed to AS 2118 standards.
- Height/area threshold — building surveyor determination
Fire-Rated Door Hardware & Self-Closers
Fire-rated doors between occupancies and common areas must be fitted with compliant door hardware including self-closing mechanisms, intumescent seals, and appropriate fire-rated door furniture. Propped or wedged fire doors are a critical compliance failure.
- All fire-rated doors — NCC and building surveyor requirement
How Much Does It Cost to Build a Rooming House in Melbourne in 2026?
Based on current AIQS Building Cost Index data (March 2026) analysis, rooming house construction costs in Melbourne range from approximately $2,700 to $4,500+ per square metre all-in including builder margin and GST. Here is how that breaks down for common rooming house configurations.
- Construction cost per sqm — standard spec
- All-in cost per sqm incl. margin & GST
- Standard 5-room rooming house (~250sqm)
- Premium 7-room rooming house (~320sqm)
- Ensuite installation (per room, existing building)
- Fire safety compliance upgrade (existing building)
- Full renovation / fit-out upgrade (existing RH)
- Contingency budget (recommended)
- Construction cost per sqm — standard spec$2,100–$2,800/sqm
(trade cost) - All-in cost per sqm incl. margin & GST$2,700–$4,500/sqm
(2026) - Standard 5-room rooming house (~250sqm)$680,000–$1,050,000
(2026) - Premium 7-room rooming house (~320sqm)$960,000–$1,440,000+
(2026) - Ensuite installation (per room, existing building)$18,000–$32,000/ensuite
- Fire safety compliance upgrade (existing building)$15,000–$65,00
plus
(2026) - Full renovation / fit-out upgrade (existing RH)$80,000–$250,000
plus
(2026) - Contingency budget (recommended)10–15% of construction cost
(2026)
(2026)
- Construction cost per sqm — standard specBefore builder margin and GST. AIQS BCI March 2026 standard residential benchmark.
- All-in cost per sqm incl. margin & GSTStandard to premium Class 1b rooming house builds, metropolitan Melbourne.
- Standard 5-room rooming house (~250sqm)Construction cost only. Add planning/permit fees, site works, and contingency separately.
- Premium 7-room rooming house (~320sqm)Full ensuites, kitchenettes, commercial fit-out, premium finishes throughout.
- Ensuite installation (per room, existing building)Wet area extension, plumbing, waterproofing, tiling, ventilation. Varies by access and complexity.
- Fire safety compliance upgrade (existing building)Highly variable. Depends on existing condition, number of rooms, and extent of deficiencies. Gap assessment required first.
- Full renovation / fit-out upgrade (existing RH)Complete internal renovation. Scope drives cost — assessed and quoted on fixed-price basis after site inspection.
- Contingency budget (recommended)For site-specific surprises (subfloor conditions, service clashes, council variations). Always include.
Sources: AIQS Building Cost Index March 2026, Pekaj Group Melbourne tender analysis April–May 2026. All figures indicative, actual costs depend on site conditions, specification, scope, and contractor pricing. Rooming House Victoria provides a detailed fixed-price quote after site assessment. Past costs do not guarantee future pricing.
Pre-Construction
Site establishment, working drawings finalised, trades engaged, materials ordered, building permit issued
4–8 weeks
Slab & Frame
Site preparation, footings, slab pour, wall frames, roof structure — all to Class 1b FRL specifications
8–14 weeks
Lock-Up
Roof sheeting, external cladding, windows, and doors, building weatherproofed and secured
8–12 weeks
Rough-In & Fire Safety
Rough-In & Fire Safety
Electrical, plumbing, fire safety systems, acoustic lining, and insulation — all specified and coordinated
8–14 weeks
Fit-Out & Finishes
Tiling, ensuite completion, flooring, joinery, painting, fit-out, appliances, and commissioning
10–16 weeks
Compliance & Handover
Defect inspection, occupation permit, CAV licence, council registration, safety certificates, keys
4–8 weeks
Not Just New Builds, We Fix, Upgrade, and Rectify Existing Rooming Houses Too
Many of the most urgent construction needs in Melbourne's rooming house sector involve existing buildings, compliance failures, fire safety deficiencies, outdated fit-outs, or defective builds left by inexperienced contractors. We address all of these.
Compliance Upgrades — Existing Rooming Houses
Fire safety system installation, acoustic wall upgrades, ensuite additions, ventilation improvements, window security, exit lighting — all compliance gap items assessed and rectified to current Class 1b and CAV standards.
Gap assessment included
Defect Rectification
Built by another company and left with defects? Waterproofing failures, fire-rated construction deficiencies, structural movement, subfloor issues, we assess and rectify. Independent defect reports available on request.
Independent assessment available
Full Renovation & Upgrade Programs
Comprehensive renovation of existing rooming houses to improve yield, reduce vacancy, and extend asset life, new ensuites, new fit-outs, re-rooming, acoustic upgrades, and full cosmetic refresh to current co-living market standards.
Fixed-price program
Rooming House Construction in Melbourne, Answers
The questions investors ask most before engaging a rooming house construction company. Plain language, no jargon, no vague answers.
From site assessment to design, approvals and construction, we provide end-to-end rooming house building services in Melbourne tailored to your goals.
Custom Home Builder
Rooming House Builder
Building a successful rooming house requires more than standard residential construction. Every project must balance compliance, tenant functionality, construction efficiency, and long-term investment performance.
As experienced rooming house builders in Melbourne, we deliver tailored building solutions designed around your site, budget, and development goals while managing the entire construction process from planning through to final handover.
Real Estate Developer
Investor-Focused Construction
Successful rooming house developments depend on careful planning, efficient construction, and strong financial outcomes. Whether you are expanding your investment portfolio or developing your first project, we help deliver rooming house construction projects that support long-term rental performance and compliance requirements.
Our team works closely with experienced rooming house real estate developers in Melbourne to streamline project delivery, minimise delays, and ensure construction aligns with your investment objectives.
Building Consultant
Feasibility & Council Approvals
Construction delays often begin long before building starts. Proper feasibility assessments, council approvals, and compliance planning are essential to keeping your project on track and avoiding unnecessary setbacks.
Working alongside a trusted rooming house building consultant in Melbourne ensures your project is reviewed carefully from the beginning, helping identify risks early while supporting smoother approvals and construction delivery.
Construction Company
End-to-End Project Management
Managing multiple consultants, approvals, trades, suppliers, and construction schedules can quickly become overwhelming without the right systems and experience in place.
As a professional rooming house construction company in Melbourne, we oversee every stage of the construction and project delivery process, ensuring your development stays organised, compliant, on schedule, and focused on delivering a quality investment outcome.
Construction Services. 20 Years. One Free Assessment.
Whatever type of rooming house construction you need, new build, renovation, fire safety upgrade, ensuite installation, compliance rectification, or full turnkey delivery, our team has the specialist experience to deliver it correctly.
Melbourne's Rooming House Specialists
ROOMING HOUSE VICTORIA
Get in Touch